![]() Construction of the project is being headed by the Hunt / Penta Joint Venture as general contractor and will create over 5,500 construction jobs. JCJ Architecture has led the design of the new facility, which will eventually expand to include a hotel, conference center, an outdoor pool and recreational amenities, and an amphitheater and event lawn space. Construction of this $450 million project is expected to last approximately 19 months. Construction during the initial stage will also include a parking structure and surface parking with 3,400 spaces. The first phase of the new facility will feature a 184,000 square-foot casino floor with 900 Class III slot machines, poker room, retail sportsbook, and table games including blackjack, craps, roulette, and baccarat, as well as dining and other amenities. ![]() ![]() (April 5, 2023) – The Tohono O’odham Gaming Enterprise (TOGE) broke ground today on a new Desert Diamond Casino facility located near Loop 303 & Northern Parkway.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |